10.5. Progress with and achievements of the programme of measures for the first planning cycle

In 2012, Member States provided information on the progress in implementing the WFD PoMs, including the state of implementation of basic, supplementary and Key Types of Measure. Information was also provided on the overall progress that had been made and any obstacles affecting the implementation of measures.

In 2016, the data and information provided will be on the measures planned for the second cycle of WFD implementation and, as such, may not provide explicit information on the actual progress, success and achievements of the first PoMs. It is intended that Member States provide an update of progress to reflect the actual and expected situation at the start of the second planning cycle.

submit comment

Class: Progress

  1. Please include here any comments which apply to all the schema elements in this Class.
  2. In addition to those general schema element level comments, we welcome your views on: a) whether you think this Class can be simplified;  and b) whether you think the linkages with other reporting Classes or Schemas can be improved, and how;

submit comment

rbmpGeneralProgress - Optional.

Report a brief description of the progress achieved since the first RBMP, in particular on the reduction of pressures achieved and measures taken.  

submit comment

financeSecured - Required.(YesNoCode_Enum)

Indicate whether a clear financial commitment (e.g. approved budget or financial mechanism by the Parliament, Ministry of Finance or other financial responsible authority) was secured for the implementation of the PoMs. 

submit comment

financeSecuredAgriculture - Required.(YesNoNotApplicable_Union_Enum)

Has a clear financial commitment been secured for the implementation of the PoMs in the following sector: agriculture? If the measures for this sector are not relevant in the RBD report ‘Not applicable’. 

submit comment

financeSecuredIndustry - Required.(YesNoNotApplicable_Union_Enum)

Has a clear financial commitment been secured for the implementation of the PoMs in the following sector: industry? If the measures for this sector are not relevant in the RBD report ‘Not applicable’.

submit comment

financeSecuredUrban - Required.(YesNoNotApplicable_Union_Enum)

Has a clear financial commitment been secured for the implementation of the PoMs in the following sector: urban development? If the measures for this sector are not relevant in the RBD report ‘Not applicable’.

submit comment

financeSecuredTransport - Required.(YesNoNotApplicable_Union_Enum)

Has a clear financial commitment been secured for the implementation of the PoMs in the following sector: transport? If the measures for this sector are not relevant in the RBD report ‘Not applicable’.

submit comment

financeSecuredHydropower - Required.(financeSecuredHydropower)

Has a clear financial commitment been secured for the implementation of the PoMs in the following sector: hydropower? If the measures for this sector are not relevant in the RBD report ‘Not applicable’.

submit comment

financeSecuredEnergy - Required.(YesNoNotApplicable_Union_Enum)

Has a clear financial commitment been secured for the implementation of the PoMs in the following sector: energy (non-hydropower)? If the measures for this sector are not relevant in the RBD report ‘Not applicable’.

submit comment

financeSecuredAquaculture - Required.(YesNoNotApplicable_Union_Enum)

Has a clear financial commitment been secured for the implementation of the PoMs in the aquaculture sector? If the measures for this sector are not relevant in the RBD report ‘Not applicable’.

submit comment

financeSecuredRecreation - Required.(YesNoNotApplicable_Union_Enum)

Has a clear financial commitment been secured for the implementation of the PoMs in the recreation sector? If the measures for this sector are not relevant in the RBD report ‘Not applicable’.

submit comment

financeSecuredFloodProtection - Required.(YesNoNotApplicable_Union_Enum)

Has a clear financial commitment been secured for the implementation of the PoMs in the flood protection sector? If the measures for this sector are not relevant in the RBD report ‘Not applicable’.

submit comment

newRegulation - Required.(NewRegulation_Enum)

Indicate whether new legislation or regulations were required to implement the PoMs in the first cycle.

submit comment

statusImplementationPoM - Required.(StatusImplementationPoM_Enum)

Select the description from the enumeration list which best describes the level of implementation of the first cycle of PoMs in the RBD. 

  • BE-Fl Belgium Flanders (invited by kristpet (disabled)) 27 Mar 2019 10:07:38
    • The indication about the status of implementation of the complete plan of measures is to general. "all/Some/none measures completed" does not provide much information on progress of the plan

submit comment

improvementInStatusGeneral - Required.(ImprovementInStatusGeneral_Enum)

Select the expected or actual improvement in general in the overall status of water bodies at the end of the first planning cycle from the enumeration list.

submit comment

improvementsInStatusEcologicalSWB - Required.(ImprovementInStatusGeneral_Enum)

Select the expected or actual improvement in the ecological status or potential of surface water bodies at the end of the first planning cycle from the enumeration list.

submit comment

improvementsInStatusChemicalSWB - Required.(ImprovementInStatusGeneral_Enum)

Select the expected or actual improvement in the chemical status of surface water bodies at the end of the first planning cycle from the enumeration list.

submit comment

improvementsInStatusQuantitativeGWB - Required.(ImprovementInStatusGeneral_Enum)

Select the expected or actual improvement in the quantitative status of groundwater bodies at the end of the first planning cycle from the enumeration list.

  • LU - Luxembourg1 (invited by kristpet (disabled)) 29 Apr 2019 09:47:34

    Please add the option "Not applicable".

    As in Luxembourg there are no groundwater bodies assigned to the international RBD Meuse, we couldn't report this schema element for that RBD and had to include it in our annex 0.

submit comment

improvementsInStatusChemicalGWB - Required.(ImprovementInStatusGeneral_Enum)

Select the expected or actual improvement in the chemical status of groundwater bodies at the end of the first planning cycle from the enumeration list.

  • LU - Luxembourg1 (invited by kristpet (disabled)) 29 Apr 2019 09:47:43

    Please add the option "Not applicable".

    As in Luxembourg there are no groundwater bodies assigned to the international RBD Meuse, we couldn't report this schema element for that RBD and had to include it in our annex 0.

submit comment

obstaclesGovernance - Required.(YesNoCode_Enum)

Have governance issues presented an obstacle to the implementation of the PoMs?  

submit comment

obstaclesDelays - Required.(YesNoCode_Enum)

Have unexpected planning delays presented an obstacle to the implementation of the PoMs?  

submit comment

obstaclesLackOfFinance - Required.(YesNoCode_Enum)

Has a lack of finance presented an obstacle to the implementation of the PoMs?  

submit comment

obstaclesLackOfMechanism - Required.(YesNoCode_Enum)

Has the lack of a mechanism for implementing measures (e.g. national regulations not yet adopted) presented an obstacle to the implementation of the PoMs?  

submit comment

obstaclesLackOfMeasures - Required.(YesNoCode_Enum)

Has a lack of effective measures presented an obstacle to the implementation of the PoMs?  

submit comment

obstaclesNotCostEffective - Required.(YesNoCode_Enum)

Have  some planned measures no longer being considered to be cost effective presented an obstacle to the implementation of the PoMs?  

submit comment

obstaclesExtremeEvents - Required.(YesNoCode_Enum)

Have any unexpected extreme events presented an obstacle to the implementation of the PoMs?  

submit comment

obstaclesOther - Optional.

Report if other obstacles were encountered in the implementation of the PoMs. More than one other obstacle may be reported in the same string.

submit comment

measuresFromFirstProgrammeReference - Required.(ReferenceType)

Provide references or hyperlinks to documents and sections that contain more information on the progress and achievements of the programme of measures from the first planning cycle. Guidance on what should be included in this document is provided in Section 10.5.3.3.

submit comment

Guidance on the contents of RBMPs/background documents

(Please see the full text of this sub-section in the WFD Reporting Guidance 2016 or above chapter)

Include here any comments that relate to the information contained in this sub-section of the Reporting Guidance, namely concerning information you think could/should be reported electronically and information which you believe should not be included in the River Basin Management Plans or background documents.

submit comment