Post a comment on the text below

article113aAnnual20152021 - Required.

Report the total annual operational and maintenance costs, and any other costs, (in millions of Euros) of planned measures under Article 11.3.a during the second planning cycle.

Previous comments

  • ES - Spain (invited by kristpet (disabled)) 21 Mar 2019 12:32:10

    It is quite unclear what is asked for here. the guidance states:

    Total annual costs should exclude all annual costs of waste water treatment plant functioning.

    Does it mean that for all types of measures already implemented we should exclude annual costs or is it just refering to waste water treatment plants?

    Clarify: We undestand that it refers only to operational and maintenance cost of planned measures

  • IT - Italy (invited by kristpet (disabled)) 27 Mar 2019 15:06:17

    It is not always possible to have the annualCosts (operational and maintenance) for all the measures separated from the investementCosts. It could be one schema element with the total costs (annual + investment).

    • EL - Greece (invited by kristpet (disabled)) 02 May 2019 12:20:29

       

      It is not always possible to have the annualCosts (operational and maintenance) for all the measures separated from the investementCosts. It could be one schema element with the total costs (annual + investment).

       EL supports this comment and the proposal for one schema element with the total costs.

You cannot post comments to this consultation because you are not authenticated. Please log in.